- wa-ID
- wa-2020989
- Tag der Veröffentlichung
- 19.12.2016
- Aktualisiert am
- 10.12.2016
- Verfahrensart
- Einladungswettbewerb
- Auslober
- Bestway Investment Asia Pte Ltd
- Preisgerichtssitzung
- 10.12.2016
- Preisgerichtssitzung
- 12/2016
Located in front of the Sanya High-speed Railway Station, the project is a mixed-use tourist attraction and transportation hub. It will feature a retail podium, shopping streets/village, a hotel, serviced apartments, a wedding/event hall, a cinema, a children’s playground and a sky garden, all of which are linked to the high-speed rail and tram stations as well as the bus terminal.
The design is inspired by the Chinese dragon and phoenix. The continuous canopy system links different programmes, presenting an integrated and grand morphology. The canopy system and set-back terrace, combined with vernacular tropical plants, provide visitors a featured tropical destination.
The project aims to offer a unique public realm experience to all local and foreign visitors.
Directors
Kevin Wang, Keith Griffiths
Gross Area of the Entire Development
275,242 sqm
Completion Year
2019
weitere Informationen:
www.aedas.com/en/what-we-do/featured-projects/sanya-integrated-commercial-and-transportation-hub
The design is inspired by the Chinese dragon and phoenix. The continuous canopy system links different programmes, presenting an integrated and grand morphology. The canopy system and set-back terrace, combined with vernacular tropical plants, provide visitors a featured tropical destination.
The project aims to offer a unique public realm experience to all local and foreign visitors.
Directors
Kevin Wang, Keith Griffiths
Gross Area of the Entire Development
275,242 sqm
Completion Year
2019
weitere Informationen:
www.aedas.com/en/what-we-do/featured-projects/sanya-integrated-commercial-and-transportation-hub